You can not select more than 25 topics
Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
1.3 KiB
1.3 KiB
Phase P40: Codebase Hardening & Audit Grade Documentation
1. Objective
Achieve "Audit Grade" status for live trading readiness, focusing on:
- Fail-Closed Readiness Checks (Deadman Switch).
- Strict Idempotency (Client Order IDs).
- Persistent Risk Halts (Capital Protection).
- Operational Hardening (No Secrets, No Open Ports).
2. Changes Implemented
2.1 Codebase
- Readiness:
LiveReadinessmodule ensures environment health before every live order. - Idempotency:
OrderIdempotencymodule persists request hashes to prevent duplicate submissions. - Risk:
RiskGuardnow persists halt states to disk, surviving process restarts. - Gates: P39 (Ops Hygiene), P21 (Secrets), P40 (Live Readiness).
2.2 Documentation
- Audit Review:
docs/third_party_review_outside_freqtrade.mdprovides a comprehensive system overview for external auditors. - Runbook: Updated
docs/OPS_RUNBOOK.mdwith Safe Mode procedures.
3. Verification
- Gate P40: Validates proper fail-closed behavior for Deadman switch.
- Soak Logs:
health.jsonmetrics track system stability. - Acceptance Suite: All gates automated via
scripts/accept_all.sh.
4. Next Steps
- External Audit Review.
- Production Deployment (Phase P41).