You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
freqtrade/docs/PHASE_P40.md

1.3 KiB

Phase P40: Codebase Hardening & Audit Grade Documentation

1. Objective

Achieve "Audit Grade" status for live trading readiness, focusing on:

  • Fail-Closed Readiness Checks (Deadman Switch).
  • Strict Idempotency (Client Order IDs).
  • Persistent Risk Halts (Capital Protection).
  • Operational Hardening (No Secrets, No Open Ports).

2. Changes Implemented

2.1 Codebase

  • Readiness: LiveReadiness module ensures environment health before every live order.
  • Idempotency: OrderIdempotency module persists request hashes to prevent duplicate submissions.
  • Risk: RiskGuard now persists halt states to disk, surviving process restarts.
  • Gates: P39 (Ops Hygiene), P21 (Secrets), P40 (Live Readiness).

2.2 Documentation

  • Audit Review: docs/third_party_review_outside_freqtrade.md provides a comprehensive system overview for external auditors.
  • Runbook: Updated docs/OPS_RUNBOOK.md with Safe Mode procedures.

3. Verification

  • Gate P40: Validates proper fail-closed behavior for Deadman switch.
  • Soak Logs: health.json metrics track system stability.
  • Acceptance Suite: All gates automated via scripts/accept_all.sh.

4. Next Steps

  • External Audit Review.
  • Production Deployment (Phase P41).